Knotlow/Crimbo Mine

Excellent trip into Knotlow last night. There were eight of us altogether, three from TSG, three Eldon and two Crewe. John rigged down the Climbing Shaft and the second pitch into Pearl Chamber. Richard and I followed, and then I turned off and started rigging the Chain Passage through to the 210 Shaft, while John continued down to rig the Waterfall Chamber pitch. The group split and went both ways around the circuit we had created, with Jess and Bernie following me down past a re-belay at the Meccano Passage level.